• Home
  • Latest News
  • Careers
  • Links
  • Contact us
  • Intranet
  • About us
  • Services
  • QA/QC
  • HSE
  • Consultancy
Kirk Petrophysics - the core handeling specialists

Services

 

Lithotarge

It has been widely acknowledged that core handling is critical to the maintenance of core integrity. Unfortunately, cores often don’t undergo adequate handling procedures

Read more...
 
Lithofreeze

The rig site handling of unconsolidated core is a risky process that might hamper core integrity if appropriate procedures are utilized.

Read more...
 
Lithoseal - core preservation

The main purpose of core preservation is to retain the pore fluids in the undisturbed core samples thus preventing saturation and wettability alteration.

Read more...
 
Lithopink

Cases of invasion of core-stabilization products into fractures are often seen. This represents a common and often serious problem in the subsequent geological description of slabbed cores.

Read more...
 
Lithotrack

The fundamental objective of coring is to obtain core that is representative of the reservoir rock properties.

Read more...
 
LithoStore

StoreCore primarily serves the Oil Industry but also provides services to numerous Universities and Research Institutions.

Read more...
 
Lithocore on site services

Kirk Petrophysics provides expert on-site core handling services.

Read more...
 
Lithocore on site services
  • CORE PLUGGING
  • CORE PACKAGING
  • CORE PHOTOGRAPHY STUDIO
  • CORE SLABBING
  • GAMMA RAY
  • XTREM-UV
  • MINI PERMEAMETER
  • CORIAS
  • EPSLOG
  • SPECTRA-MAP

Core packaging


Kirk Petrophysics offers a safe solution to store core samples of any size into a friendly specially designed container.

The containers ensure a secure transportation of materials from the well site to the laboratory.

This system has a considerable advantage over existing packaging in that it is built up in modular pre-shaped layers. In other words, the size of the package directly relates to the nature and number of samples being sent thereby reducing postage costs.

Characteristics

  • Interlocks to form a secure and stable stack up to a height of ten metres
  • Available on a choice of six feet, two runners or three runners
  • Light and strong
  • Solid or ventilated sides
  • Wide width fork entry for quick and easy location by forklifts
  • Available for all core size.
LithoCore core packaging

 
  • Accessibility
  • Sitemap